SAR 85,000
Front-maintained LED canvas with mounting steel, power/data distribution, receiving cards, controller, spare modules, calibration and commissioning.
- Proposed model
- 1.2 mm indoor COB, non-touch
- Lead time
- 4–6 weeks
- Installation
- Structural backing, dedicated power and ventilated controller location



